Tuesday, October 19, 2010

Cabinet handling line details



Cabinet level within the twisted pair in the back of the cabinet. In the past, do not sort out these twisted pair, or a simple bandage immediately after the patch panel, then, from behind the cabinet looked like a waterfall as the level of heave twisted pair, where the number of roots or nylon random lashing strap on both sides of the cabinet. We focus on concern the performance of each twisted pair tested.

With the increased level of wiring, cabling systems engineering business has been through the construction process and checks at each level, be sure to have each thread through performance testing. Then, attention turned to the beautiful.

According to GB, the vertical cable tray within 1.5 meters should be banding every time (to prevent the cable should pull the weight of produce distortion caused by cable), on the inside and does not require the level of bridge. The end panels, cabinets, patch panels, wiring box in accordance with the standards must be parallel to the two bottom corners, so the beauty of wiring systems mainly in the engine room on the cable part.

The engine room of the cable into the enclosure often patch panel patch panel or wall hanging. In this article, mainly related to the management line of rack-type patch panel technology.

In the cabinet front, manufacturers have created a variety of shapes patch panels, patch cord manager and other components, the positive aesthetic has been no problem. The cabinet rear of the beautiful, often for people's attention, causing people not to visit after the completion of the internal cabinet.

In the engine room, it should be done into the engine room of each line from the beginning until the patch panel of the module so far, should not be smooth vertical and horizontal cross. Cable in accordance with the requirements of electronic equipment, so that each corner part has a fixed cable, cable in the corner office to ensure a certain degree of turning radius, while to achieve smooth vertical and horizontal.

The requirements also apply to the cabinet rear. Since the level of twisted-pair is no longer arranged into a waterfall-type ideal, and therefore the level of the cabinet should be reasonable on the twisted pair cable.

Line management of the term has been heard from in a number of construction workers, but the implications are all different, the reason is that management practices are not the same process line.

In order to do cable beautiful, I saw three types of line management process:

Waterfall model

This is a relatively old wiring shape, and sometimes you can still see the trace. It adopted the "Water Curtain Cave on Flower Fruit Mountain," the artistic image, from the patch panel of the module directly to the twisted pair heave down the distribution of a very pretty neat when the level of influenza (24-48 roots on each twisted pair ).

This model has the advantage of saving labor management line, the disadvantage is more, such as: easily damaged when installing network equipment shapes, and even easy to install in place of the phenomenon of network equipment; all the weight of each twisted pair into a pulling force, the role of In the back of the module. If prior to the termination point on the twisted pair is not bandage, then this rally may be in a few months, several years after the module and the twisted-pair separation, causing disconnection fault; event in the patch panel in one module need to re-termination, that maintenance personnel can only probe into the "curtain" within the construction, sometimes wearing dozens of roots twisted pair, and not because of bi-directional light source, resulting in termination when the blind.

Reverse line management

Reverse management module line is terminated in patch panels after, and through testing, further management line. The method is to start from the module to the rack outside the management line, also carried out within the same bridge management line. This has the advantage of handling line test, will not pass a test root UTP caused management to re-line, but the disadvantage is due to both ends (inlet and the patch panel) have been fixed in the engine room of the bound to a particular number of random lines (usually in the bottom of the cabinet).

Reverse the general management line management line for the man, with eyes and hands to complete management line.

Reverse line has the advantage of management testing has been completed, do not worry about the back of the cable length of the cabinet. The disadvantage is that because the cable ends are fixed, cable will have a lot of crossover between, to reason very neat effort, and in between two fixed end there must be a twisted pair is scattered, the often under-floor office (next into the line), or ceiling, on (upward mobility lane).

Forward Management Line

Positive management line is terminated before the patch panel cable management. It is the inlet from the engine room began to organize cables paragraph by paragraph, until the patch panel of the module until the Department. Reasonable line of conduct after the termination and testing.

Forward line management goal is to be achieved: from room (or room network zones) inlet to the level of twisted pair wiring cabinet to each 16/24/32/48 port patch panel as a unit, forming a Beam-beam level of twisted pair wiring harness, each beam line all the parallel of all the twisted pair (UTP within a short distance, parallel lines produced will not affect the overall performance of the crosstalk between, as cable tray and wire tube Laying the most of each twisted pair, partly dissipate into the atmosphere, is not parallel), all the parallel between the wiring harness; in cabinet after each bending beam twisted pair advantage of the opportunity to lay the patch panel rear, the entire process remained within the twisted pair wiring throughout in parallel. Each module in the back of the module from the wiring harness at the bottom of the corresponding twisted pair out, after confirmation of fixed shore line in the module shelves or go into the hole patch panel module.

Management line has the advantage of being able to ensure the engine room wire at each point are neat, and will not be cross cable. The disadvantage is that if the cable itself was damaged when threading, then the test pass will create new management line. Therefore, the premise of positive management line is the quality of cable and stringing enough to grasp.

Management line has the advantage of being in the room (computer room between the network area or weak) in the inlet to the patch panel from among all the neat, parallel, very beautiful. Disadvantage is that construction workers on their construction quality to have a full grasp, only to re-terminated in basically not be carried out based on the forward line of construction management. In this article, based on the current cabling engineering company has been able to grasp the reality of project quality, recommended management line process forward.

Positive management line labor required is about 1.5 people per 24 line takes about 40 minutes (excluding the time to find line number). Tools required are as follows:






Li line list of tools being

Management line management line board is an indispensable tool for positive, it can be used fibreboard, laminated boards or planks made in the field can also be used in post-production company.

Management board production line approach is very simple: measure the diameter with a twisted pair cable, and attach to form 2-4mm diameter cable management board, and then board the strength of selection between the hole and the hole spacing in the horizontal planning board 5 lines, vertical lines designated five written code after the space left after the board determined length and width dimensions. Under the excess part of the cut or saw, use the pistol drill crossed the intersection in order to set the aperture drilling 25 holes, you use coarse sandpaper to chamfer the edge after all, write in the lateral (or engraved) 1-5 in number, written on the vertical (or engraved) AE number after you're done.

Line management board is a 25 hole square plate (corresponding to 24 patch panel suitable pore size 5 脳 5 board management line, you can also use 4 脳 6,8 脳 8 and other specifications), single-sided printing, you can wear every hole a standard twisted pair. Imagine: When the twisted-pair cable penetration management board, the relative position between the basic fixed, according to its position when banding is not prone to large dislocation phenomenon appears more difficult to cross-cable phenomenon.

Objective: Use 24 1U patch panel, patch panel cable from the right rear (looking back from the patch panel) shifted patch panel, twisted pair wiring harness at the bottom out of turn from the patch panel, to ensure top The twisted pair has been arranged to last from 21 to 24 modules.

Note: Figure 1-24 in number for the patch panel module number, not really needed to fill in, and the patch panel modules correspond to the line number number.

Management board need to use the appropriate line management line management line of the table with.

Line management is an artificial definition of the table form, when using 5 脳 5 line management board, management and 5 rows on Table 5 of the table, each cell corresponds to a hole. Complete line of table management can have a variety of ways, each corresponding to one kind of fill in the order of method. Introduced in the picture on the right one in the order (the hole on the figure represents distribution frame module number):

Fill in the actual line management table should correspond with the patch panel port cable lines 1-24 tick line management table, so that line numbers on the number of modules and patch panels-one correspondence. Under normal circumstances, when the patch panel layout is completed, you can use EXCEL's linkage function, automatically form the rationale for each patch panel line table.

Forward the basic construction technology management line as follows:

1, the patch panel fixed in place, install the bracket behind the front will print the line number of the panel of paper into patch panel (or posted on the patch panel), the module can be removed if the patch panel, then should remove the module;

2, line management board positioning: Management Board in line before threading should determine its direction, so that line management board logical line hard-line course does not need to reverse the direction of the nearest hole to allow the natural targeting E1 1 module, then Line management board 2-5 hole and patch panel 2-5 parallel. This method is usually used to locate: first line vertically on the management module, 1 behind the front of the 1st hole to E1 module (with the word side towards the 24 modules), and then holding down the wire management line of board route toward the future, to move the engine room inlet, moved to ensure that management appears only parallel line board, not rotate, when the management board to reach the inlet line when the line of plates down management orientation (mainly A1 hole the location of the position) in order to line up each piece of management board to use.

3, management board threading line: in the engine room of the inlet side, the management board by two lines determined by the direction of the plate position adjustment is good, the standard twisted-pair line by line number table according to penetrate management line management board (there are A face their own words, the line side of the word never penetrate plate), This process is generally completed two: one to find line number (as long as the line to find the management board can be required to line number) and its separated from other cables, one to line management line of plate penetration hole corresponding to. It should be noted that the twisted pair cable should be all through the management board, that is, line management board should be close to the inlet side, so as to ensure that the twisted pair into the room all by finishing;

4, route management line: first logical line of the lateral plate (no word side) with a nylon cable tie to penetrate the roots of management board of the twisted pair line tied into a bunch; then management board along the lines specified in the direction of route to their translation, translation 100mm plate lateral roots after the logical line of nylon cable ties once again lashing (previous banding to prevent loose), and you should pay attention to the formation of round wire harness, and wiring harness should be outside the line management line of boards outer circle line, the middle line management line of boards within the beam line to determine the relative after all twisted-pair parallel to the patch panel has been to maintain the most remote module posterior (ie back of 24 modules) ; continue to shift management board 200mm line around the lateral root logical line board lashing with nylon cable ties, attention should be maintained of each line with the previous position when the same banding, some lines are not allowed into the inner from the outer layer, or into the outer layer allows the inner line; turn pan, until the patch panel so far;

5, wiring harness fixed: logical line process, if next to the bridge on the face or cabinet hole bar line bar lines within the board, should harness the same time in lashing lashing wire harness on the bridge or the cabinet, so as not to harness down;

6, corner management line: When the pan turns encountered in the process, they must make reasonable line of board close to the turning angle, turning the corner along the side, not lashing then paste the corner (due to the inside corner office lines are short, long line outside, so if the bandage and then turn straight line, corner office will harness deformation). This requires that all wiring must be in the field bandage, not in advance and then moved to the site to post-banding;

7, bracket management line: When the rationale behind the line of patch panel bracket plate on arrival, the first wiring harness lashing in the bracket, and then shift forward, each time before the arrival of a module will harness banding once Then separate the line number corresponding to the module. This process should be equipped with 2: 1 point line, a line of people pulled from the patch panel distribution frame front to the back (if the module can be unloaded from the module holes will line through to the front to go), while 2 sing the check number on line number and MDF panel numbers are the same;

8, complete the management line: when the last one to wear to the patch panel front line after line of board of management has not a line, and then the beam line management line end.

9, will be out of the management board to re-wire line to get into the mouth, use the next 24 patch panel cable management table, in turn repeat 1-8, to complete a bunch of lines under the management line of work, until all complete multi-beam line management line (branch management line)

When the cabinet has a number of patch panels, each patch panel's wiring harness should be reasonable line, respectively. However, the binding wire rack panel width is limited (typically a width of 100mm), only 3 to 4 side by side lashing beam 24 of the wiring harness, and the cabinet depth of 800mm right up to put two binding wire board (cabinet twisted pair should be within the level of unilateral bandage, so as not to affect the appearance), which may not reach the level of banding 200 twisted pair of goals. Then you can use the second-line management, first line management using the 8 脳 8 board bar the 48's wiring harness (6 脳 8), to a certain height, Adds a reasonable line of 5 脳 5 board the harness points 2 beam, to continue handling line to patch panels.

Some companies use the comb for positive management line management line management line of the tool plate to avoid threading the time-consuming process, but the management line comb and disadvantages. For example: the process of logical line of twisted-pair easily escaped from the comb; If the management line can not be completed immediately, a few days in the line management line of hair out may have their own, and you have to re-wire into the comb.

Now, some cabling vendors have introduced a special line of equipment management, from photos to see if need to take up additional rack / tray space, which may be useful for reducing line interference, but also asked the cabinet / bridge greater space. This is required for each cabinet to accommodate hundreds of twisted-pair when the root is the need to be considered before construction.

Distribution Cabinets

According to the management line, the process can be found on the cabinet wiring system has special requirements. Production plants in the cabinet, often equipment cabinet (installation of public broadcasting, security, industrial control equipment), communications cabinets (installation of computer network equipment, optical terminal boxes and other equipment), server rack (installed on the server computer), and wiring cabinets (installation of an integrated wiring patch panel and computer network equipment) and other types of plants in the cabinet, most production equipment cabinets and server racks, dedicated to the cabinet wiring cabling systems are rarely produced. So many engineering companies in fact use the equipment rack or cabinet to replace the wiring cabinet communications.

Cabinet wiring cabling system is a special custom cabinets. The special point is to add some accessories unique wiring system, and the layout of the proposed special power requirements.

In the cabinet's rear left side (looking forward from behind, between the rear panel and the column), all closed before installing a metal power groove, which extends from the bottom cabinet to the cabinet top, in which the top dedicated to the fan power socket. Vertical installation completely closed metal power groove to avoid disturbing the power generated on the level of twisted pair. In most of the cabinet, using a standard installation of the power delay line board, this structure makes it part of the power outlet and horizontal spacing between the twisted pair is less than 200mm, so it is not the ideal power distribution structure.

Bar-line panel: In the cabinet on the right rear (looking forward from behind, between the rear panel and the column), install two 100mm wide, iron, board, 10mm intervals along the vertical direction to open a 5 脳 100mm waist hole, iron length of the base plate from the cabinet to the roof. Similarly, in the left rear (power supply between the tray and column) to install the same piece of iron. Alignment of the outer plate appearance requirement smooth, no burrs, so as not to damage cable, bar line piece of metal plate close to the ground power trunking, cable laying in the side and can only transmit voice-size on the number of cable;

銆??搴曠洏锛氬悗閮ㄥ紑1涓?00脳200mm鐨勯暱鏂瑰瀷杩涚嚎瀛旓紝鐢ㄦ鐨9杈癸紝浠ュ厤鎹熶激鐢电紗銆傚湪瀛斾笂鏂?0mm澶勶紝鍙互瀹夎涓?潡闅旀澘锛屼互姹傛満鏌滃唴鐨勭編瑙傘?

銆??鍓嶇珛鏌辫窛鐜荤拑闂ㄤ箣闂村皢涓ゆ牴鍨傜洿鐞嗙嚎妲?甯︾洊锛屾彃榻垮瀷缁撴瀯锛屽垎绔嬪湪涓や晶鐨勭珛鏌卞)銆?br />
銆??鎺ュ湴锛氬湪鏈烘煖涓儴鑷綆鍒伴《鍨傜洿瀹夎涓?牴鎺ュ湴閾滃甫锛岃閾滃甫涓婃瘡闅?U绛夎窛寮?涓狹6绮楃墮铻轰笣瀛旓紝浠ヤ究浜庡睆钄介厤绾挎灦灏辫繎鎺ュ湴锛屽叾涓渶涓嬬鐨勮灪涓濆瓟鐢ㄤ簬鏈烘煖寮曞嚭鎺ュ湴绾裤?鏈烘煖鐨勫悇涓噾灞為儴浠跺潎搴旀帴鍦帮紝浠ュ疄鐜版満鏌滅殑鏁翠綋鎺ュ湴锛岃?涓旀満鏌滄帴鍦板簲閫氳繃鎺ュ湴閾滃甫涓婄殑鎺ュ湴寮曞嚭绾挎帴鑷虫満鎴跨殑鎺ュ湴閾滄帓涓娿?

銆??鍦ㄦ満鏌滅殑涓や晶搴斿悇鍏锋湁涓ょ粍骞舵帴铻烘爴瀛旓紝骞堕厤鏈夊苟鎺ヨ灪鏍擄紝褰撴暟涓秹瀵嗙瓑绾х浉鍚岀殑閰嶇嚎鏈烘煖骞舵帓鏀剧疆鍦ㄤ竴璧锋椂锛屾渶濂戒娇鐢ㄥ苟鎺ヨ灪鏍撳皢鏈烘煖杩炴帴鎴愪竴涓暣浣撱?

銆??閰嶇嚎鏋跺畨瑁呰灪涓濆簲璇ユ弧閰?瀵逛簬42U鏈烘煖鑰岃█锛岄渶瑕侀厤84濂楀畨瑁呰灪涓?锛屽幓鐩殑鏄‘淇濋厤绾挎灦銆佺綉缁滆澶囧拰绌洪潰鏉垮叏閮ㄤ娇鐢ㄧ浉鍚岀殑瀹夎铻轰笣锛岃繖鏍锋墠鑳戒繚璇佹満鏌滄闈㈢殑缇庤銆?br />
銆??鏈烘煖瀹滄瀯鎴愬彲鎷嗗嵏寮忥紝浠ユ柟渚挎惉杩愬拰鏂藉伐銆傛満鏌滆兘澶熻鎷嗗嵏鎴?鐗?鍓嶃?鍚庛?涓娿?涓嬨?宸︺?鍙?锛岃繖鏍蜂究浜庡寘瑁呭拰杩愯緭銆傚湪鍒拌揪鐜板満鍚庯紝鍙互閫氳繃铻轰笣閲嶆柊鎷艰鎴愭満鏌滐紝褰撴満鎴块棬楂樺害鏈夐檺鏃讹紝鍙互鍦ㄦ満鎴垮唴鎷艰銆?br />






相关链接:



Cleverly hide an important part of the worksheet so that no leakage



Six college students recruited reef workplace



Waterproof Wall - terminology to explain



YouTube To WMV



Zack Rusin interviewed the beauty and magic of KDE



Matroska to MPEG



Team spirit team under distorted collective quit tragedy



Hot Nature - Screen Savers



Jinshan listing Delayed two days by the profitability of the Hong Kong question diverted



Seasonal - Screen Savers Introduction



nv4 disp.dll Blue screen error fix



GREEN Manufacturing MES successes



AVI To MKV



For You Games Sports



RUP Anti-pattern



Thursday, October 7, 2010

Ali power to help her mother five years beyond the traditional media blog



Research founder, Executive Director Jen McClure at the First BlogWorld Expo around the world to play a shot in the arm of Friends: the next 5 years, the media spent on the so-called controversial 鈹?鈹?includes content such as blog and podcast network media advertising costs will be higher than the newspapers, magazines and other traditional media. Jen McClure's words inspiring, but the best representative of the blog as web2.0, the actual situation in China is the main blog have to suffer the anguish can not be profitable. Looking As a result, Xu Jinglei, Lao Pan and other famous stars achieved both fame and fortune through the blog, but the blog's Road Star is unable to copy the Friends General Bo. Friends of the vast majority of ordinary Bo run, although you are very hard, very fast updates, articles of good quality, views are also very high, and even fixed fans already have their own group, or useless. The results are the same, ordinary people could not gain any revenue from the blog.

In fact, the largest blog advertising advantage from accurate advertising. Each Expo has its own specific wording of Friends of style, theme and the reader is relatively fixed age structure of advertisers who will become the basis for accurate delivery. But if the advertisers to do this work, it is too difficult. Blog tracking and search site Technorati, said: At present, about 110 million Internet blog, every day of approximately 120,000 new blog, Bowen released a day about 1.5 million. Allow advertisers to face a flood of updates for their products to salvage a blog style seems a bit unreasonable. On the other hand, the majority of Friends of Bo Bo is struggling with no income, can not find those where the wealthy lords.

Bo Yi Ying difficult to solve the program still need to e-commerce, on-line just over two months, Ali is undoubtedly the best choice mother. Ali Mama C2C trading model-based advertising completely opened the Expo Friends of the channel with advertisers. Ali mom of a free trade as the financial market, and demand (advertisers) Ali first entered the mother needed the trading floor in various blog categories, standing in the central gesture of a hand gestures (I want to buy anything), around the trading of interest Members reported on their willingness to quickly look up the price of transactions, transactions both at the same time, the Office receive a transaction fee. Ali mom of supply and demand sides with the possibility of trading venues and trading. Majority of bloggers on the Internet speaking, it is more important than anything else. At present, Ali Mama cat has started flapping and bokee cooperation received from the information within the Ali Mama, the new blog advertising every day in more than 20,000, and has many friends by Ali, mother Bo trading platform get the benefits.

Jen McClure's prediction can be achieved, at least for now seems a long way off, but Ali's mother has the key to a profitable blog bloggers, whether through that key open the door to wealth, as soon as possible in the era of sub-blog profit share depends on your choice of the Bo faithful.









相关链接:



E-cology in the Pan Micro Series 31



Comments Trace And Ping Tools



COMMENTS System Utilities



VOB to WMV



plasma tv what it was and what it BECAME



Guide Cataloging



MKV TO DivX



BEST Science - Screen Savers



Wang Haibo: Society World partners, with 10 000 win



What Is The Best Tone



RMVB to MP4



PhotoShop new tricks: PAINTINGS in paintings



To "fool"? Or To "fine"?



Listen to the voice of Chaos



The "job" into a "job search" STRATEGY



New Class is the Blue Ocean



Sunday, September 19, 2010

Firefox Download break 5 million mark will be issued a limited edition of 50 sets of


Friday, Mozilla Foundation's Firefox Web browser was downloaded more than 5 million mark.

To commemorate this historic moment, the foundation said on its Web site, they will promote meritorious officers who issued a limited edition of 50 sets of Firefox, another, Mozilla Foundation will host 5 million to the Firefox download sites were all were rewarded, but the exact amount of ominous.

Mozilla developer Blake Ross Foundation, said: "This figure not only belong to us. It is the work of our 5 years of a show the next 5 years is also the beginning of the work."

Last year in November, Firefox listed on the official version, which has shaken many analysts believe is already quite mature Web browser market structure. With the rise of Firefox, Microsoft's IE browser market share decline over the years for the first time.

It chose Firefox, mainly for IE browser security holes found in the endless boredom. Some prominent security researchers have even suggested that, if possible, users are advised not to use the IE browser.

This year in February, Microsoft said, before listing in Longhorn, they will launch a new version of IE browser. Microsoft said the new IE's focus will be on creating a secure browsing environment.

And Firefox, in the past few months, also broke several serious security flaws. However, the open source community believe that their browser architecture is still safe than IE.






Recommended links:



Using filter EFFECTS create fantastic images



Secret benefits to customers Shi Xiaoen



Wma Ipod



FreeBSD editor VI



Screenshot Screenshot effects of extraction



For you Games Arcade



Rising Harm The User Did Not Apologize For Doing Odd Tiger, Said To Be Practical



m4v TO flv



Maxthon financial pages and information on-line grand



Google Video Format



PC redemption



The world's smallest digital music player coming soon



Windows media player m4v



STORM infringement advice to the court sentenced the company abandoned online play



Games Card Shop



Thursday, July 15, 2010

COREL KNOCKOUT matting examples Guide (4)


table align = center border = 0 width = 582>
The third lesson to pull the shadows to take the object
This course describes the pull to take the object, how to take the same time pull the shadow of the object. You will be able to:
* How to hide the constituency lines;
* Draw and edit objects in the shadow of the internal and external constituencies;
* The shaded image;
* Test results.


Pull the shadows to take

1. The input file.
1. Click the menu FILEOPEN;
2. The search process in accordance with the directory;
3. Double-click the folder TUTORIAL FILESKNOCKOUT PROJECTS;
4. Double-click the file SHADOW.CKO;
5. Click the menu VIEWHIDE ALL.
2. Draw the shadow of an internal constituency.
1. Click on the "shadow of the internal" constituency tools;
2. Along the contour line drawn in the shadow of the internal constituency lines.
When crossed, we should hide behind objects in the foreground shadows are also included;


The correct method of drawing
3. If you want to add, or delete constituency lines, combined with SHIFT key and the ALT key. Press DELETE key will delete
In addition to all the constituencies line.
3. Draw the shadow of external constituencies.
1. Click on the Tools disk external constituencies tools;
2. Along the contour line, in the shadow of the external contour line drawing constituency. Methods with shadow draw lines within the constituency.


The correct method of drawing

3. If you want to add, or delete constituency lines, combined with SHIFT key and the ALT key. Press DELETE key will delete
In addition to all the constituencies line.
Future steps we all know, I do not introduced. If in doubt, refer to the first lesson of this tutorial. Here's the time to show action in accordance with the above, just pull the shadows to take the object, you also need to pull shadow before taking the knowledge learned will be used before the prospect of never taking an object to pull.

g height = 130 src = "mihu1109snap2.gif" width = 186>








Recommand Link:



converter avi to 3gp



avi to 3gp



Professional DVD To Divx Xvid



Cucusoft DVD To IPod Converter F3.6



Movkit Video Pack



SPARK Trilogy: to see how we change the World



Christmasgift MOV to DVD



Youtube to 3GP Software



ImTOO DVD Ripper Platinum



Remain a Top: the blue sea to



Simple Games Simulation



flac to wav



Infomation Audio Players



My favorite Seasonal - Screen SAVERS



windows 7 rmvb



Friday, July 9, 2010

Delicacy DVD Converter

Delicacy DVD Converter - A fast video to DVD VOB converter which can convert and burn AVI, MPG, MPEG 1/2/4, WMV, MOV, MP4, RM, RMVB, DivX, Xvid, ASF, 3GP, Youtube FLV to DVD VOB VCD SVCD easily. With this DVD VCD SVCD converter, you will know how to make a DVD video. You can use it to convert and burn DivX, Xvid, AVI, MPG, MPEG 1/2/4, WMV, MOV, MP4, RM, RMVB files to DVD with chapter Menu. With that, you can convert downloaded videos and burn files into DVD, which means Internet become the storehouse of your home theater! Get Free download now!

Delicacy DVD Converter - What a powerful and attractive AVI, MPG, MPEG 1/2/4, WMV, MOV, MP4, RM, RMVB, DivX, Xvid, ASF, 3GP, Youtube FLV to VOB converter. This software can burn DivX to DVD and convert DivX to VOB and finish all your tasks with the fastest speed possible and the best quality available. No one will ask how to make a DVD video anymore once they try this great DivX to VOB converter. We highly recommend this program because we think it will make your multimedia life a lot easier and more enjoyable. It allows you to specify NTSC or PAL format, adjust 4:3 or 16:9 video aspect, and burn either DVD disc or ISO file. By setting bitrate and framerate, you can get excellent quality on TV screen. Just free download and enjoy it right now!



Recommand Link:



Wizard Dial Up And Connection Tools



Christmasgift RMVB to DVD



how to convert mp3 To mp4



isofter-dvd-audio-ripper-deluxe.xml



3gp



SuperBurner DVD To iPod



convert Vob to mp4



Ever MP3 CDA RA to M3U Editor



Apple DVD M4V Burner



Top Browser Tools



convert avi to Mpeg4



Professional DAT MPEG4 Converter



Music PDA Guide



Top Personal Finance



Tuesday, June 29, 2010

Movavi PSP Video Suite

Movavi PSP Video Suite is a simple yet smart and powerful application for converting videos and DVDs. With Movavi PSP Video Suite, you can easily rip DVDs and convert video in the most popular formats to MP4 format for PSP at blazing speeds!

Rip your DVD collection: start DVD to PSP converter as a DVD Ripper and save unprotected DVDs to your PSP. Just add your DVD, select the preffered language and subtitles, choose a ready-made preset, and save your video!
Convert video: select a video in any popular video formats and save the movie for your PSP using PSP Video converter!


Input video formats: AVI (DivX, XviD, etc.), DV AVI, MP4 (Apple TV, iPhone, iPod, etc), WMV (including Zune), ASF, 3GP, 3GP2, 3GPP, 3GPP2, QuickTime (MOV, QT), DVD, VOB, IFO, VIDEO_TS, AUDIO_TS, MPG, MPEG 1,2,4, VRO, MOD, DAT, MJPEG, VCD, SVCD, H.263.

Join multiple video files into one large movie, extract soundtracks from your videos and DVDs and save it in the MP3 format.

Use powerful editing tools to optimize your videos: cut, merge, crop, rotate, adjust, and even add watermark!



Recommand Link:



HD to iPod NANO 4Gen converter



Catalogs Clipboard Tools



Acala DVD Creator



Bluesea DVD-Audio MP3 AAC to OGG Backup



SoundTaxi Professional Platinum



Youtube to MP4 Help



HOW do I convert video to Cowon O2PMP



Youtube to Wii Online



Good GAMES Board



How Do I Convert HD To IRiver P35



Professional DVD To Flash Wii QuickTime



Swf to mov



INTRODUCTION Icons



SUPERBURNER VCD to DVD